会员登录|免费注册|忘记密码|管理入口 返回主站||保存桌面|手机浏览|联系方式|购物车
企业会员第1年

深圳市家佳明光电科技有限公司  
加关注0

UL/PSE认证LED日光灯;UL/CUL认证LED球泡灯;高光效LED横插灯;UL/SAA认证LED射灯;UL/CUL认证LEDPAR灯

搜索
新闻中心
  • 暂无新闻
产品分类
  • 暂无分类
联系方式
  • 联系人:王永亮
  • 电话:86 0755 29515852
  • 传真:86 0755 29515850
站内搜索
 
荣誉资质
  • 暂未上传
友情链接
  • 暂无链接
首页 > 供应产品 > 供应LED日光灯 过CE UL PSE 认证T818W 1.2米 LEDT8灯管 灯管
供应LED日光灯 过CE UL PSE 认证T818W 1.2米 LEDT8灯管 灯管
单价 面议对比
询价 暂无
浏览 987
发货 广东深圳市
品牌 alite
过期 长期有效
更新 2024-03-30 13:29
 
详细信息
功率:18(W) 光通量:1700(LM) 输入电压:AC85-265(V) 尺寸:1200(mm) 外壳材质:铝 灯头规格:G13 型号:T8 显色指数:80 色温:4000(K) 品牌:alite 外管类型:透明,条纹,乳白 灯光颜色:正白 寿命:50000(H)

Power: 16w 1200mm 
Efficacy:92-100lm/w (3000k) 
2 years warranty 
led brand: Lextar 

 

2012 new design dimmable led tube

Product Features

1. Replacement of 35W Halogen Lamp.

2. Special advanced led power supply make long life time

3. 270degree, less dark area on surface.

4. Efficacy: as high as 110lm/w

Applications

General illuminations, industrial lighting, office lighting, commercial lighting

CE, ROHS

Description & Highlighted Features
Product NameT8-16W-1.2M-G13
Base (standard designation)G13
Led BrandTW LEXTAR 3014
LED Quantity160pcs
Lifespan>30,000h
Warranty2 years
Operating Temp. -20 to +40dgr
Highlighted FeaturesModular design of inside power supply, plug connection
  
  
Electrical Data 
Power Consumpution16W
VoltageAC120/230V
Operating Frequency50/60 Hz
Power Factor≥0.95
Efficacy>90lm/W(WW)
Dimmable Available
  
Optical Data 
Luminous Flux1580lm(WW) for frosted cover
Max.Luminous Intensity780cd
Beam Angle270°
Color WW,NW,CW
Color Rendering Index72-80ra
  
Dimension 
Overall Length1200mm
Diameter24.5mm

Trading Terms

1.  Payment term: T/T 30% deposit before production, 70%balance to be paid before delivery

2.  Production lead time:  15-20 days for bulk order, 7-10 days for sample order

3.  Shipping Term: EXW

4. Delivery Port: Shenzhen port

5. MOQ: 1-200PCS

6. Packing: bubble packing; customer s logo and label are avaialable for order more than 200pcs


 

About us

Alite Co.,LTD, founded in 2008, specialized in commerical lighting manufacture integrated with design, production, sales and do service for all over world customers, we have excellent RD team with decade years experience in led lighting.

 Factory

 

Updated Time:2012-10-13 10:53 

Thank you for your time and looking forward to do business with you!

 

NEW HOT Dimmable 270dgr high-tech led t8 tube lights most competitive price

Verified InformationThis information is Verified by Bureau Veritas and validity period is 2012/09/18 --- 2013/09/18All the information below may covers both Gold Supplier and its related companies , Their Relationship will be affirmed according to china laws and regulations , also it will be clearly display in the full report >>Production Capacity:Product line nameProduction Line CapacityActual Units Produced(Previous Year)
LED Tube100,000pcs/month227,500pcs
Export Market Distribution:MarketRevenue(Previous Year)Total Revenue (%)
North AmericaUSD 908,00042.45
South AmericaUSD 129,0006.03
Eastern EuropeUSD 137,8006.44
Southeast AsiaUSD 125,8005.88
AfricaUSD 26,8001.25
Mid EastUSD 86,8004.06
Western EuropeUSD 267,20012.49
Central AmericaUSD 268,20012.54
Northern EuropeUSD 178,9008.36
Southern EuropeUSD 10,6800.5
Production Machinery:Machine NameBrand & Model No.QuantityNumber of Year(s) UsedCondition
Reflow soldering machineFS & FS-42012.0Acceptable
Electronic hot plateHualun & CT-94612.0Acceptable
Brass foot squeeze riveterGU1012.0Acceptable
Laser marking machineGuangda & GD-DP-5012.0Acceptable
Testing Machinery:Machine NameBrand & Model No.QuantityNumber of Year(s) UsedCondition
Digital power meterEVERFINE & PF990172.0Acceptable
AC power sourceHuayuan & HY990562.0Acceptable
DC regulated power supplyQJE & QJ3003XE32.0Acceptable
Hi-pot testerCHANGSHENG & CS2672DX22.0Acceptable
Burn-in systemMeiao12.0Acceptable
LCR digital bridgeYangzi & YD2810H12.0Acceptable
Capacitor leakage testerYangzi & YD2611D12.0Acceptable
Production Flow:1.Test semi-manufactured products2.Weld the wire of semi-manufactured product3.Put the semi-manufactured products in insulative tube4.Install the driver in the aluminum housing5.Install LED chip on PCB board6.Connect the cap7.Fix PC cover and examine by eyes8.Install cap9.Test over-voltage and function10.Age test11.Test the function12.Pack products in cartonCertification:Certified PictureCertification NameCertified ByCertificate No.Product Name & Model No.Available Date-Expired Date
ULULIFAR.E353969LED-TUBE2012/06/14 --- 2049/12/31
CETOKETK11111921-S-ELED TUBE & LED-TX-YYW-ZZM-G132011/11/19 --- 2049/12/31
CETOKETK11111922-S-LLED TUBE & LED-TX-YYW-ZZM-G132011/11/19 --- 2049/12/31
PSETOKETK11111923-S-PLED TUBE & LED-TX-YYW-ZZM-G132011/11/19 --- 2049/12/31
Email to this supplier